Sazmining works exclusively with best-in-class, carbon-free powered hosting facilities. Ensure your facility has no wasted capacity by accessing Sazmining’s network of Bitcoin miners.
Our first facility in Wisconsin, which went live in January 2023, was filled with customer rigs within three months of operation.
In January 2025, we launched our most advanced mine in Norway—powered by 99% carbon-free energy and pioneering miner heat reuse for a more sustainable future.
A 2.2MW Heat Reuse Facility. 99% carbon-free Energy
A 5MW data center that we've expanded to 8.3MW to meet increasing demand.
1.2 MW Hydropowered Facility.
If you have at least 5 megawatt of renewable energy capacity, we’d love to chat!