Sazmining works exclusively with best-in-class, carbon-free powered hosting facilities. Ensure your facility has no wasted capacity by accessing Sazmining’s network of Bitcoin miners.
Bitcoin mining on 100% carbon-free Energy
1.1 MW Heat Reuse Facility, Norway
From Wisconsin to the Arctic Circle
Our first facility in Wisconsin, which went live in January 2023, was filled with customer rigs within three months of operation.
We expanded to Paraguay in September 2023, growing our data center from 5MW to 8MW to meet demand.
In January 2025, we launched our most advanced mine in Norway—powered by 99% carbon-free energy and pioneering miner heat reuse for a more sustainable future.
Norway
Operational since Jan, 2025.
A 1.1MW Heat Reuse Facility. 99% carbon-free Energy
Paraguay
Operational since Sep, 2023.
A 5MW data center that we've expanded to 8MW to meet increasing demand.
Wisconsin
Operational since Jan 2023.
1.4 MW Hydropowered Facility.
Become a Data Center Partner
If you have at least 5 megawatt renewable energy capacity, we’d love to chat!